You Are Wrong – Presidency Replies Kwankwaso, Names Tinubu’s Northern Projects

Posted by Thandiubani on Fri 25th Jul, 2025 - tori.ng

In a statement on Friday, the Presidency slammed Kwankwaso for claiming President Bola Ahmed Tinubu neglected the north.

 
The Presidency has accused former Kano State Governor, Rabiu Musa Kwankwaso of lying.
 
In a statement on Friday, the Presidency slammed Kwankwaso for claiming President Bola Ahmed Tinubu neglected the north.
 
Recall that Kwankwaso had on Thursday criticised the Tinubu administration for what he described as the neglect of the northern region of Nigeria and the concentration of the nation’s resources on developing the southern part of the country where the president comes from.

“Let me advise the Federal Government on the distribution of federal resources,” the former Kano governor said on Thursday at the Kano State Stakeholders’ Dialogue on the 2025 Constitutional Amendment.

“From the information available to us, it’s like most of the national budget is now tilting in one direction in this country.”
 
Reacting in a statement, Tinubu’s Media Aide, Sunday Dare, said the President has the north covered, adding that northern Nigeria is not left behind.
 
He went on to release evidence by naming some of the Federal Government projects across the north.
 
See list below:
 
For starters : Under President Tinubu
Abuja-Kaduna-kano Expressway
Sokoto-Badagry Expressway
Sokoto-Zamfara-Katsina Expressway
 
AGRICULTURE
 
1. $158.15m Agriculture Value Chain (VCN) Programme for nine Northern states
2. Kolmani Integrated Development Project (Bauchi and Gombe States)
3. Agro-Climatic Resilience in Semi-Arid Landscapes (ACReSAL) — a six-year World Bank–funded programme to restore 1 million hectares of degraded land and improve climate resilience in Northern Nigeria states
4. Kano River Project (irrigation scheme) — large-scale integrated irrigation development in Kano State, commissioned in 2023 and operational under the current administration
 
HEALTH
 
5. Ahmadu Bello University Teaching Hospital, Zaria, Kaduna (North West)
6. Federal Teaching Hospital, Katsina (North West)
7. University of Jos Teaching Hospital, Jos, Plateau (North Central)
8. Reference Hospital, Kaduna (North West)
9. Usmanu Danfodiyo University Teaching Hospital, Sokoto (North West)
10. Abubakar Tafawa Balewa University Teaching Hospital, Bauchi (North East)
11. Harmony Advanced Diagnostic Centre Complex, Ilorin, Kwara (North Central)
12. Federal Medical Centre, Nguru, Yobe (North East)
13. Jos University Teaching Hospital, Jos, Plateau (North Central) — additional expansion
14. Reinvigoration of about 1,000 Primary Health Centers, PHCS in the North
 
ROADS AND HIGHWAYS
 
15. Kano–Kongolam Road (Section II: Kano–Kanwar–Danja–Hadejia)
16. Yakasai–Zalli Road
17. 1,068 km Sokoto-Badagry Super Highway (Northern section including Sokoto and Kebbi)
18. 258 km, 3-lane Carriageway (Section 2, Phase 2A: CH 120+000–CH 378+000) in Gulumbe, Kebbi State
19. Abuja–Kaduna–Zaria–Kano Dual Carriageway
20. Biu–Kangiwa–Kamba–Gaya–Niger Republic Road (30 km segment)
21. Malando–Garin Baka–Ngaski–Wara Road (CH.0+000 – CH.79+586)
22. Koko–Besse–Zaria–Kala Road
23. Abuja–Kaduna–Kano Highway (375 km)
24. Repair of the Gamboru Bridge (Gamboru–Ngala–Kala–Balde Road in Borno State)
25. Expansion of Mararaba–Keffi Road (43.65 km)
26. Construction of Lafia Bypass Road (Nasarawa State)
27. Kano–Maiduguri Dual Carriageway
28. Adamawa–Taraba Single Carriageway
29. Adamawa–Borno Single Carriageway
30. Kaduna–Jos Road (Single Carriageway)
31. Zaria–Funtua–Gusau–Sokoto Road (Dual Carriageway)
32. Zaria–Hunkuyi–Daya Road (Sections I, II & III – 152.67 km) — rehabilitation project in Kaduna and Kano States
33. Reconstruction of Dikwa–Gamboru–Ngala Road (49.55 km) — strategic corridor reconstruction in Borno State
 
ENERGY AND GAS
 
34. Ajaokuta–Kaduna–Kano Gas Pipeline (AKK) (614 km)
35. Gwagwalada Power Plant (FCT, Abuja – connected with AKK pipeline)
36. ABIBA Solar Power Station, Kaduna (50 MW) — planned solar power plant to boost renewable energy capacity in Kaduna State
 
RAIL AND METRO
 
37. Kaduna–Kano Rail Line (203 km, part of Lagos-Kano Rail Project)
38. Kano–Maradi Rail Line (285 km, linking Kano, Jigawa, Katsina to Maradi in Niger Republic)
39. Kaduna Light Rail System — ₦100 billion budget allocation to develop light rail public transport in Kaduna
40. Abuja Metro Line Rehabilitation (Abuja Light Rail)
 
WATERWAYS & TRADE CORRIDORS
 
41. Trans-Sahara Trade Route — infrastructure development to connect trade routes from Calabar through Nasarawa and Abuja towards Northern Nigeria and beyond
 
NATIONAL PROGRAMMES & INSTITUTIONS
 
42. National Agency for the Great Green Wall (NAGGW) — renewed mandate and leadership for desertification combat in Northern Nigeria
43. Nigeria Erosion and Watershed Management Project (NEWMAP) — ongoing erosion control and watershed infrastructure development in the North.

 

Popular Stories
Choosing BTC Miner cloud mining is equivalent to opening a dedicated automatic money printing machine for yourself
Oh No! See Hero Dog That Sacrificed Its Life to Save Family By Killing Four Deadly Cobras (Photo)
Unbelievable! Meet the Man Who Survived Three Days in a Whale's Belly After He Was Swallowed (Photos)
Pastor Caught Pants Down While Trying to Sleep With a Married Woman (Photo+Video)
Rihanna LookAlike Makes Money From Her Looks


Copyright © 2025 Tori.ng - All rights reserved
Tori.ng is owned and managed by Cyclofoss Technologies Ltd.